Health Centre Zagreb - Centre, Avenue V. Holjevca 22 is located on cadastral plot no. 890/1; cadastral municipality Zaprudski otok, at the address Avenue Većeslava Holjevca 22, Zagreb. The gross construction area is 8391,95 m², and the heated area of the building is 5997,62 m².
“Kapov” d.o.o., 21000 Split, Doverska Street 24, prepared the design documentation for the comprehensive energy renovation project.The Main Design (ZOP): 68/24 consists of 10 volumes (books):
BOOK 1 - MAIN DESIGN - ARCHITECTURAL PROJECT
Architectural Design Office “Kapov” d.o.o., Zagreb
Designer: Ivan Kapov, dipl. ing. arch., License No. A3424
Design Code: T.D. 68/24 - GP
BOOK 1-1 - OVERVIEW OF ALL APPLIED FIRE PROTECTION MEASURES
Flamit d.o.o., Samobor
Authorized person for preparation of the overview: Željko Mužević, univ. spec. aedif.
Overview Reference No.: 170225
BOOK 2 - MAIN DESIGN - STRUCTURAL PROJECT
Ultrastudio d.o.o., Zagreb
Designer: Andrej Marković, dipl. ing. civ. eng., License No. G3722
Design Code: T.D. 11/25
BOOK 3 - MAIN DESIGN - MECHANICAL PROJECT - HEATING, COOLING AND VENTILATION SYSTEM
Eco plan d.o.o., Duga Street 35, 42223 Varaždinske Toplice
Designer: Zoran Bahunek, dipl. ing. mech. eng., License No. S1699
Design Code: T.D. 24/148_S
BOOK 4 - MECHANICAL PROJECT - WATER SUPPLY, SEWERAGE AND FIRE HYDRANT NETWORK
Eco plan d.o.o., Duga Street 35, 42223 Varaždinske Toplice
Designer: Zoran Bahunek, dipl. ing. mech. eng., License No. S1699
Design Code: T.D. 24/148_H
BOOK 5 - MAIN DESIGN - ELECTRICAL PROJECT - POWER AND WEAK CURRENT INSTALLATIONS AND LIGHTNING PROTECTION SYSTEM
Vukušić projekti d.o.o., Marina Getaldića 5, 10410 Velika Gorica
Designer: Bojan Vukušić, mag. ing. elec. eng., License No. E2955
Design Code: T.D. 255/24-ETP
BOOK 6 - MAIN DESIGN - ELECTRICAL PROJECT - PHOTOVOLTAIC POWER PLANT
Vukušić projekti d.o.o., Marina Getaldića 5, 10410 Velika Gorica
Designer: Bojan Vukušić, mag. ing. elec. eng., License No. E2955
Design Code: T.D. 255/24-SE
BOOK 7 - MAIN DESIGN - MECHANICAL PROJECT - LIFT REPLACEMENT PROJECT
Office of Chartered Mechanical Engineer Denis Paleka, dipl. ing. mech. eng.
Designer: Denis Paleka, dipl. ing. mech. eng., License No. S1326
Design Code: T.D. DP-14/25
BOOK 8 - PROJECT FOR RATIONAL ENERGY USE AND THERMAL PROTECTION OF THE BUILDING
Architectural Design Office “Kapov” d.o.o., Zagreb
Designer: Ivan Kapov, dipl. ing. arch., License No. A3424
Design Code: T.D. 68/24-F
BOOK 9 - MAIN DESIGN - ELECTRICAL PROJECT - CNUS SYSTEM
Torden plan d.o.o., Split
Designer: Ivica Buljubašić, mag. ing. elec. eng., License No. E2514
Design Code: T.D. 25018-CNS
BOOK 10 - MAIN DESIGN - ELECTRICAL PROJECT - AUTOMATIC FIRE ALARM SYSTEM
Vukušić projekti d.o.o., Marina Getaldića 5, 10410 Velika Gorica
Designer: Bojan Vukušić, mag. ing. elec. eng.
| INFORMATION ABOUT THE BUILDING IN QUESTION (ETC-u) | |
| Year of construction [year]: | 1980. |
| Gross construction area of building [m2]: | 8.391,95 |
| The useful surface area of the building, (AK) [m2], total floor net area of the heated part of the building: | 5.997,62 |
| Total useful surface area of the building [m2]: | 7.079,15 |
| Current energy performance class [based on specific annual thermal energy required for heating Q''H,nd]: | D |
| Expected energy performance class after renovation [based on specific annual thermal energy required for heating Q''H,nd]: | A |
| Annual thermal energy required for heating (QH,nd) before energy renovation [kWh/year] (baseline value): | 853.780,86 |
| Annual thermal energy required for heating (QH,nd) after energy renovation [kWh/year] (target value): | 125.616,15 |
| Reduction of annual heating energy demand (QH,nd) [kWh/year] (contribution): | -728.164,71 |
| Designed savings in thermal energy required for heating (QH,nd) [%]: | 85,29% |
| Annual primary energy (Eprim) before energy renovation [kWh/year] (baseline value): | 1.244.575,98 |
| Annual primary energy (Eprim) after energy renovation [kWh/year] (target value): | 9.321,99 |
| Reduction of annual primary energy (Eprim) [kWh/year] (contribution): | -1.235.253,99 |
| Designed savings in annual primary energy after energy renovation (Eprim) [%]: | 99,25% |
| Share of energy from renewable energy sources in annual delivered energy before energy renovation [%] (baseline value): | 0,00% |
| Share of energy from renewable energy sources in annual delivered energy after energy renovation [%] (target value): | 97,50% |
| Increase in the share of energy from renewable energy sources in annual delivered energy [%] (contribution): | 97,50% |
| Reduction of CO₂ emissions [% on an annual basis]: | 99,00% |
| Photovoltaic power plant | |
| Total installed capacity of the generating plant [ kVA ]: | 260,00 |
| Planned annual energy production [ kWh ]: | 260.000,00 |