Health Centre Zagreb – Centar, Rapska 39
Activities

Health Centre Zagreb – Centar, Rapska 39

The Health Centre Zagreb - Centar, Rapska 39 is situated on cadastral plot no. 2428/9, cadastral municipality Trnje, at the address Rapska 39, Zagreb. The gross construction area is 594,99 m², and the heated area of the building is 513,45 m².

Saeptum d.o.o., Čakovec, Travnička Street 50A, prepared the design documentation for the comprehensive energy renovation project. The Main Design (ZOP): SAE-205-24 consists of 8 volumes (folders):

VOLUME 1 - MAIN ARCHITECTURAL DESIGN - COMPREHENSIVE ENERGY RENOVATION
Designer: Toni Borković, dipl. ing. arch., A2706
Saeptum d.o.o., Travnička 50A, Čakovec / Kružna Street 81, Zagreb
Design Code: T.D. 205-2024

VOLUME 2 - MAIN STRUCTURAL DESIGN
Designer: Igor Hranilović, dipl. ing. civ. eng., G212
Info-G d.o.o., Svetice 36, 10000 Zagreb
Design Code: T.D. 2024-1147

VOLUME 3 - MAIN MECHANICAL DESIGN OF HVAC INSTALLATIONS
Designer: Velimir Dvoršćak, dipl. ing. mech. eng.
Multimont d.o.o., Babonićeva 56A, Zagreb
Design Code: T.D. 1/2025

VOLUME 4 - MAIN ELECTRICAL DESIGN
Designer: Vladimir Varga, dipl. ing. elec. eng.
VV-ELEKTROPROJEKT d.o.o., Erlichova 9, 10000 Zagreb
Design Code: T.D. 190-24

VOLUME 5 - MAIN FIRE ALARM SYSTEM DESIGN
Designer: Vladimir Varga, ing. elec. eng., E2017
VV-ELEKTROPROJEKT d.o.o., Erlichova 9, Zagreb
Design Code: T.D. 191-24

VOLUME 6 - MAIN ELECTRICAL DESIGN OF THE PHOTOVOLTAIC POWER PLANT
Designer: Vladimir Varga, ing. elec. eng., E2017
VV-ELEKTROPROJEKT d.o.o., Erlichova 9, Zagreb
Design Code: T.D. 192-24

VOLUME 7 - MAIN BUILDING AUTOMATION AND CONTROL SYSTEM DESIGN
Designer: Tomislav Slaviček, mag. ing. elec. eng., licensed electrical engineer E3650
SBT d.o.o., Buzin, Bani 75, Zagreb
Design Code: T.D. 001-05-2025

VOLUME 8 - MAIN DESIGN OF THE INCLINED PLATFORM LIFT
Designer: Božidar Fumić, dipl. ing. mech. eng., S594
Maintenance d.o.o., R. K. Jeretova Street 3, 10000 Zagreb
Design Code: T.D. 24/25

INFORMATION ABOUT THE BUILDING IN QUESTION (ETC-u)  
Year of construction [year]:  1986.
Gross construction area of building [m2]: 594,99
The useful surface area of the building, (AK) [m2],  total floor net area of the heated part of the building: 513,45
Total useful surface area of the building [m2]: 513,45
Current energy performance class [based on specific annual thermal energy required for heating Q''H,nd]: E
Expected energy performance class after renovation [based on specific annual thermal energy required for heating Q''H,nd]: A+
Annual thermal energy required for heating (QH,nd) before energy renovation [kWh/year] (baseline value): 86.971,00
Annual thermal energy required for heating (QH,nd) after energy renovation [kWh/year] (target value): 14.222,00
Reduction of annual thermal energy required for heating (QH,nd) [kWh/year] (contribution): -72.749,00
Designed savings in thermal energy required for heating (QH,nd) [%]: 83,65%
Annual primary energy (Eprim) before energy renovation [kWh/year] (baseline value): 225.603,00
Annual primary energy (Eprim) after energy renovation [kWh/year] (target value): 3.413,00
Reduction of annual primary energy (Eprim) [kWh/year] (contribution): -222.190,00
Designed savings in annual primary energy after energy renovation (Eprim) [%]: 98,49%
Share of energy from renewable energy sources in annual delivered energy before energy renovation [%] (baseline value): 0,00%
Share of renewable energy in annual delivered energy after energy renovation [%] (target value): 92,70%
Share of energy from renewable energy sources in annual delivered energy after energy renovation [%] (target value): 92,70%
Reduction of CO₂ emissions [% on an annual basis]:: 98,50%
Photovoltaic power plant  
Total installed capacity of the generating plant [ kVA ]: 20,00
Planned annual energy production [ kWh ]: 35.000,00